Do you need your landlord's permission to get full fibre?
Short answer
Usually, yes. Openreach says the property owner's consent is required before any installation work begins, as fitting full fibre means drilling a small hole and fixing boxes inside and outside. In a block of flats, the freeholder or managing agent must also agree a wayleave. A 2025 proposal to give private tenants a right to request it was withdrawn.
Updated
12mm
The hole Openreach drills through the wall for a full fibre install
Free
Openreach's installation, for landlords and tenants
4 hours
Roughly how long Openreach says a full fibre installation takes
Full fibre means a cable into the building and a box on the wall, so it is a change to someone else's property. This guide covers what Openreach needs from your landlord, what changes in a block of flats, what the law does and does not give tenants, and what to do if the answer is no.
Why does full fibre need your landlord's permission?
Because the installation drills into the building and leaves equipment fixed to it, which is the owner's decision.
- Openreach tells landlords that their permission is needed before any full fibre installation work can begin, and it provides consent forms for them to sign.
- The work runs a fibre cable from a nearby pole or underground to a small junction box on an outside wall, then through a 12mm hole to an ONT box inside, which your router plugs into.
- The boxes are about 15cm by 13cm outside and 13cm by 11cm inside. Openreach says installation is free, standard installations do not need planning permission, and it covers the cost of repairs if its engineers cause damage.
- Openreach's installation checklist asks renters to have the landlord's permission for any drilling inside or outside before the engineer arrives.
- Citizens Advice says to check your tenancy agreement too, which might say you cannot switch internet, landline or TV provider, and to ask your landlord if a change involves drilling holes for cables or putting up a satellite dish.
Sources: Openreach: landlords, single dwelling unit (read 15 October 2026); Openreach: what will happen during my Full Fibre installation (read 15 October 2026); Citizens Advice: check how to switch your internet, phone or TV provider (read 15 October 2026)
What is a wayleave, and why do flats take longer?
In a block of flats the fibre has to come through communal areas first, and the freeholder or managing agent has to agree.
- Before Openreach can install full fibre in a block of flats, it needs permission from the freeholder or managing agent to access the building. That permission is a wayleave.
- For buildings built before 2000, Openreach also needs a copy of the building's asbestos register before it can survey or start work.
- Openreach says the process from survey to completion can take several months after the wayleave is signed, and that installation costs landlords and tenants nothing.
- Tenants can help by putting Openreach in touch with the right person, whether that is the managing agent, freeholder, housing association or landlord. Its registration form is for landlords, freeholders and managing agents, and tenants should contact their broadband provider.
- Fibre can be installed however many residents are interested, Openreach says, and nobody has to use it once it is in.
Sources: Openreach: landlords, multi dwelling unit (read 15 October 2026); Openreach: broadband and wayleaves for landlords (read 15 October 2026)
Can a landlord refuse full fibre?
Openreach needs the owner's consent, and a proposal to stop landlords refusing tenants unreasonably did not become law.
- In May 2025, peers proposed adding a right for private tenants to request full fibre to the Renters' Rights Bill. Landlords could not have refused unreasonably and would have had to reply within 28 days.
- The government opposed it, saying slow rollout was mainly a problem in blocks of flats rather than across renting, and that it needed to consider how to target any intervention. The amendment was withdrawn after debate.
- In England and Wales, the government then consulted, from 15 December 2025 to 16 February 2026, on a new right for flat leaseholders to request a gigabit-capable connection.
- Its proposals say a leaseholder who lets out a flat could still use that right for their tenant, and asked whether renters need help of their own. On 15 October 2026 the government was still analysing the responses.
Sources: Hansard: Renters' Rights Bill, House of Lords, 6 May 2025 (read 15 October 2026); UK Parliament Bills: Renters' Rights Bill, right to request FTTP amendment (read 15 October 2026); GOV.UK: legislative proposals to address broadband rollout in leasehold flats (read 15 October 2026); GOV.UK: leasehold flats broadband proposals, consultation document (read 15 October 2026)
What if your landlord doesn't reply?
In a block of flats, a provider you have asked for a service can go to the courts for access when a landlord stays silent.
- The government's guidance describes a route through the courts, called Part 4A, that providers can use to get access to a block of flats when a tenant has asked for a service and the landlord repeatedly fails to respond.
- It has applied in England and Wales since 26 December 2022 and in Scotland since 1 July 2023.
- The provider has to send the landlord four notices first: a request, two warning notices at least seven days after the request, and a final notice giving 14 days to respond.
- The guidance says the route exists so that a landlord's silence alone cannot block a service. Ask your chosen provider whether it uses it.
Sources: GOV.UK: Electronic Communications Code, Part 4A guidance (read 15 October 2026); legislation.gov.uk: Telecommunications Infrastructure (Leasehold Property) Act 2021, section 1 (read 15 October 2026)
How do you ask your landlord for full fibre?
Five steps from checking the address to booking the engineer.
- 1
Check what your address can get
Look the address up on Ofcom's free broadband checker to see whether full fibre reaches it and the fastest speeds available.
- 2
Read your tenancy agreement
Citizens Advice says it might limit switching provider or drilling. Note what it says about alterations.
- 3
Ask your landlord in writing
Explain the work: a small hole, a box outside and one inside, installed free. Shelter's advice is to get the landlord's agreement in writing before any work.
- 4
Pass on the Openreach information for landlords
Openreach provides consent forms for houses and a wayleave process for blocks of flats, and can deal with a freeholder or managing agent directly.
- 5
Book the installation with your provider
Once you have written permission, order from your chosen provider. Openreach says the visit usually takes around four hours, and someone over 18 must be there throughout.
Sources: Ofcom: choose the right broadband for your needs (read 15 October 2026); Citizens Advice: check how to switch your internet, phone or TV provider (read 15 October 2026); Shelter England: making improvements to your rented home (read 15 October 2026); Openreach: landlords, single dwelling unit (read 15 October 2026); Openreach: broadband and wayleaves for landlords (read 15 October 2026); Openreach: what will happen during my Full Fibre installation (read 15 October 2026)
What can you do if you can't get full fibre?
Check whether any new work is needed at all, then compare what else reaches the address.
- Openreach asks renters for landlord approval when drilling is required, so if the home already has fibre from an earlier installation, ask your provider whether any new work is needed.
- Ofcom says that if you cannot get a decent fibre or cable connection, broadband using 5G mobile data or a satellite connection is worth a look.
- Ofcom adds that speeds and reliability on these wireless services can change depending on where you live, so check mobile coverage at the address on its checker first.
- A satellite dish is an alteration too: Citizens Advice says a landlord might say no to drilling holes for cables or putting up a satellite dish.
- Shelter's advice for tenants in England is not to make improvements without the landlord's permission, because the landlord might ask you to change things back or keep your deposit.
Sources: Openreach: what will happen during my Full Fibre installation (read 15 October 2026); Ofcom: choose the right broadband for your needs (read 15 October 2026); Citizens Advice: check how to switch your internet, phone or TV provider (read 15 October 2026); Shelter England: making improvements to your rented home (read 15 October 2026)
How can Taupia help with broadband in a rented home?
- Taupia keeps your broadband bill, monthly price and contract end date in one place, alongside energy, mobile and water.
- It compares broadband deals and switches once your household approves.
- In a shared house it splits the broadband bill between housemates and tracks who has paid. It never moves money itself.
- Permission for any installation stays between you and your landlord. Taupia is free.
Questions about full fibre in a rented home
Do I need my landlord's permission to get full fibre?
Usually. Openreach says the property owner must consent before any installation work begins, because it drills a small hole and fits boxes inside and outside. In a block of flats, the freeholder or managing agent must also agree a wayleave. Get your landlord's agreement in writing before you book.
Can my landlord refuse full fibre broadband?
Openreach needs the owner's consent, so a landlord who says no can stop the installation. A 2025 amendment that would have stopped landlords unreasonably refusing tenants' requests was withdrawn, and the government's consultation on a right for flat leaseholders had not reported by October 2026.
How long does a full fibre installation take?
Openreach says an installation usually takes around four hours, and someone over 18 must be there throughout. In a block of flats the communal work comes first: after the freeholder signs the wayleave, Openreach says survey to completion can take several months.
Does a full fibre installation cost anything?
Openreach says its installation is free, with no ongoing obligations for the owner, and that it covers the cost of repairs if its engineers cause damage. Your broadband provider may charge its own connection or setup fee, so check the order before you confirm it.
What if my landlord doesn't reply?
Keep asking in writing and tell your provider. In a block of flats in England, Wales or Scotland, a provider you have asked for a service can apply through the courts for access after sending the landlord four notices with no reply. The government says this stops a landlord's silence alone from blocking a connection.
Is 5G home broadband an alternative for renters?
It can be. Ofcom says broadband over 5G mobile data or satellite is worth considering if you cannot get decent fibre or cable, but speeds and reliability vary with where you live. Check mobile coverage at your address on Ofcom's checker before you sign up.
Broadband when you rent
Setting up, sharing and leaving broadband in a rented home.
Start here
Broadband when moving house
RecommendedCheck the new address, move or switch your service and time the start date.
Broadband in a student house share
Whose name the contract goes in, how to split it and the speed a house needs.
Broadband exit fees when moving house
What ten providers say about leaving a contract when you move.
Setting up bills when renting for the first time
Every bill to set up in a rented home, in the order to do them.
Cite this page
Taupia. "Do you need your landlord's permission to get full fibre?". Last updated 15 October 2026. https://taupia.com/move-home/full-fibre-rented-home
Renting and ready to switch broadband?
Taupia is free. It keeps your broadband bill and contract end date in view, compares deals and switches once your household approves, so nothing changes without your approval.