How do I set up the bills in a new-build home?
Short answer
Once the supply is registered, ask the developer for the electricity MPAN and any gas MPRN, then agree a start date with your supplier or stay with the developer's. Take opening readings, including the water meter, or confirm dated smart-meter readings. Book broadband for the estate's network, register for council tax before the home is banded, and arrange water billing.
Updated
£2,000
Cost cap per home for a gigabit connection under the new-build rules in England and Wales
6 months
To challenge your council tax band as a new taxpayer in England and Wales
28 days
To appeal a council tax completion notice in England
See the bills for your new address
Pick your new address to see its council tax band and charge, its water company, who supplies the energy, and broadband deals, in one list.
A new build has no previous occupant, so the usual move-in shortcuts do not work. The developer chose the energy supplier, the estate may have a single broadband network, the council tax band may not exist yet and, in England and Wales, the water will be metered. This guide covers each bill, the differences between England, Wales, Scotland and Northern Ireland, and what to set aside.
Who to contact for each bill in a new-build home
| Bill | Who supplies it | What to do first |
|---|---|---|
| Electricity | The supplier the developer chose, on a network that may belong to an IDNO. | Get the MPAN and confirm the residential supply is registered. Choose a new deal or contact the existing supplier to stay. |
| Gas | The developer's supplier, often on an independent gas transporter's pipes. | Find My Supplier shows the supplier, MPRN and transporter once the meter point is on record. |
| Broadband | Providers that sell over the network the developer installed. | Ask the developer which network serves the estate, then check that network's providers. |
| Council tax | Your council. In England and Wales, the Valuation Office sets the band. | Register when you move in. With no band yet, the council arranges one and backdates the bill. |
| Water | The water company for the area, or a NAV licensed for the site. | Take a meter reading on the day you move in and give it to the company. |
| TV Licence | TV Licensing. | Update your address, or buy a licence if you watch live TV or BBC iPlayer. |
Who supplies energy to a new-build home?
You can choose a new supplier for an available start date once the home has a registered residential supply. The developer can provide the meter details needed to arrange this.
- Ask the developer for your electricity MPAN, gas MPRN and confirmation that the meters are registered to your home. A temporary construction supply must be handed over to a residential supplier before you can switch.
- Compare tariffs and ask your chosen supplier which start dates it offers. The supplier confirms when supply starts.
- You can also stay with the existing supplier. Ask the developer who it is, then contact it with your responsibility date to open an account and discuss tariffs.
- If you use energy before an agreed contract starts, the existing supplier normally supplies it under a deemed contract. You pay that supplier for the period you are responsible for before the new deal begins, including applicable standing charges.
- Whichever option you choose, take opening meter readings or confirm the supplier can obtain them from your smart meters. Keep dated photos as a useful backup and check the first bill against the agreed dates.
Sources (3)
- E.ON Next: moving home and switching energy (read 15 October 2026)
- Citizens Advice: moving home, dealing with your energy supply (read 15 October 2026)
- Ofgem: guidance on deemed contracts (6 November 2023) (read 15 October 2026)
Why can't suppliers find my new-build address or meter numbers?
New meter points and addresses take time to reach the national records that suppliers and comparison sites use.
- To set up an account or switch, you need the MPAN for electricity and the MPRN for gas. E.ON Next says new builds' numbers are sometimes not yet on national databases, and that the developer should provide them in your homeowner pack.
- Find My Supplier, run by Xoserve, shows the MPRN, the gas supplier and the gas transporter for a property once the meter point is on record.
- Xoserve lists a mismatch between your address and its meter data as a common reason a switch fails, and only the gas shipper acting for your current supplier can ask it to correct the address.
- If Xoserve has no record of the gas supply at all, your supplier's shipper must ask for an MPRN to be created. The network operator checks the connection first, which Xoserve says can take from a few days to a few weeks.
Sources (3)
- E.ON Next: moving home and switching energy (read 15 October 2026)
- Find My Supplier, run by Xoserve (read 15 October 2026)
- Xoserve: information for gas consumers (read 15 October 2026)
What does it mean if my estate is on an independent network?
A smaller company may own the local cables or gas pipes. It changes who runs the network, not how you buy your energy.
- Ofgem says independent and out-of-area electricity network operators have historically provided the last mile of the network to new, typically domestic, customers, for example on newly built housing developments.
- The Independent Networks Association, quoted in Ofgem's October 2023 letter, puts independent distribution network operators (IDNOs) at about 1.5 million customers, with 70% to 80% of new connections adopted by IDNOs.
- For gas, Ofgem said in January 2025 that independent gas transporters (IGTs) serve around three million consumers and have overtaken the regional gas networks as the main source of new connections.
- You still buy energy from a supplier. Ofgem's rules say an IDNO may charge domestic customers no more than the regional operator's equivalent tariff, and keep IGT charges broadly in line with the regional gas networks.
Sources (2)
- Ofgem: open letter on independent distribution network operators (19 October 2023) (read 15 October 2026)
- Ofgem: independent gas transporters' relative price control, call for input (29 January 2025) (read 15 October 2026)
Why might a new-build estate have only one broadband network?
The developer chooses which network to install, and your choice of provider depends on who sells over it.
- In England, new homes built under rules in force since 26 December 2022 must get gigabit-ready infrastructure and, within a £2,000 cost cap per home, a gigabit-capable connection, or the next fastest connection available within the cap, GOV.UK says.
- The rules do not apply to building work where plans or a notice went to the council before 26 December 2022 and work started within 12 months. On a multi-home application, the start of the first building decides it for the whole site (Approved Document R).
- Wales has had matching requirements, with the same £2,000 cost cap, since 1 July 2025. Scotland has required gigabit-ready infrastructure in new buildings since 1 January 2025, with a gigabit-capable connection where reasonably practicable.
- Developers in England must set out the planned infrastructure and connection in a connectivity plan when they apply for building approval, so ask the developer which network operator it has used.
- Openreach says it installs full fibre free on residential developments of more than 19 plots, and asks developers to register a site at least six months before broadband is needed at the first home.
Sources (5)
- GOV.UK: new build connectivity, information for developers (England) (read 15 October 2026)
- GOV.UK: Approved Document R, infrastructure for electronic communications (England) (read 15 October 2026)
- legislation.gov.uk: Building etc. (Amendment) (Wales) Regulations 2025 (read 15 October 2026)
- legislation.gov.uk: Building (Scotland) Amendment Regulations 2024 (read 15 October 2026)
- Openreach: registering your site for broadband (read 15 October 2026)
Which providers can I use on an estate's own fibre network?
Only those that sell over it, so check the network before you choose a deal.
- OFNL says it runs open access full-fibre networks on new developments, with a choice of 18 residential providers, and that its postcode checker shows the providers available at your address.
- OFNL says BT has signed its agreement but currently sells only business services over its network, so BT cannot offer home broadband there.
- OFNL says there is no cost to you for building its network to your property boundary, but the provider you choose charges for the connection, with details on its website.
- FibreNest was the full-fibre network Persimmon built for its own developments. Persimmon announced its sale to BUUK Infrastructure, OFNL's group, in May 2025, saying FibreNest customers would get access to up to 18 providers.
Sources (3)
- OFNL: open access full-fibre networks on new developments (read 15 October 2026)
- OFNL: resident FAQs (read 15 October 2026)
- Persimmon: sale of FibreNest (14 May 2025) (read 15 October 2026)
Why does my new address not show on broadband checkers?
The databases behind the checkers trail behind new building.
- Ofcom says its checker uses Ordnance Survey address data updated twice a year, so some new properties may not appear until an update has gone in.
- Ofcom also says some smaller networks are not yet in its checker, and that where no prediction shows, you should check availability on the networks' own websites.
- Openreach says its fibre checker can show the wrong details because of the way its records are matched to properties, and that you or your provider can ask it to check and correct them.
Sources (2)
- Ofcom: about the broadband and mobile checker (read 15 October 2026)
- Openreach: my Fibre Checker result is wrong (read 15 October 2026)
When does council tax start on a new build, and why is there no band?
From the day you move in, or the date on a completion notice. If the home has no band yet, the bill arrives later and is backdated.
- GOV.UK says that if the property you have moved into has no council tax band, contact your local council and it will arrange for the property to be assessed (England and Wales).
- Peterborough City Council, for example, says council tax on a new build is payable from the date it is occupied or the date on a completion notice, and that it backdates the bill once the band is set.
- Peterborough says a completion notice goes to the owner when a home is structurally complete or the remaining work can reasonably be finished within 3 months. GOV.UK says you must appeal within 28 days, and pay council tax from the date on the notice while you appeal.
- The Valuation Office bands a new home on what it could have sold for on 1 April 1991 in England or 1 April 2003 in Wales, using sales of comparable homes and the bands of similar properties.
- Banding can be slow. In March 2026 Peterborough warned that the Valuation Office's new operating system was causing delays of over a year in some cases, and suggested paying on account to avoid a large balance.
Sources (4)
- GOV.UK: start paying Council Tax (England and Wales) (read 15 October 2026)
- Peterborough City Council (example council): register a new build for council tax (updated 2 April 2026) (read 15 October 2026)
- GOV.UK: appeal a council tax completion notice (read 15 October 2026)
- Valuation Office Agency: how we value new properties for Council Tax (21 March 2024) (read 15 October 2026)
Can I challenge the council tax band on a new build?
- GOV.UK says you have a legal right to challenge a band if you have been paying council tax on the property for less than 6 months, or if the Valuation Office has changed the band in the last 6 months.
- If the home has no band yet, you can ask for it to be added to the list, and you need to suggest a band.
- A challenge with a legal right can take up to 4 months to decide, and you must keep paying council tax while it is reviewed.
- Scotland: GOV.UK says challenges go to the assessor at your local valuation joint board or council, and mygov.scot says to register for council tax when you move in.
- Northern Ireland: nidirect says Land & Property Services must value a new home before it can issue a rates bill, that rates are due from the date it decides the home can be lived in, and that a valuation review can take around 90 days.
Sources (3)
- GOV.UK: challenge your Council Tax band (read 15 October 2026)
- mygov.scot: registering for Council Tax (updated 1 April 2026) (read 15 October 2026)
- nidirect: apply for a new domestic property to be valued (read 15 October 2026)
Who supplies water to a new build, and will it have a meter?
In England and Wales, a new house comes with a meter, and the estate may have its own licensed supplier.
- CCW says that since 1990 all new houses have had to have a water meter. A metered bill is the water you use plus a standing charge.
- If your new home has a meter, CCW says you pay metered charges and cannot switch to an unmetered bill. Citizens Advice says to take a reading as soon as you move in.
- Some estates are served by a NAV: a company approved by Ofwat to supply water or sewerage, or both, to specific sites instead of the usual company for the area. CCW says NAVs work to the same rules as the main companies.
- Scotland: most homes pay water and waste charges alongside council tax, mygov.scot says. Northern Ireland: domestic water charges are deferred, NI Water says.
Sources (6)
- CCW: how is my water bill calculated? (read 15 October 2026)
- CCW: what if I move to a property with a meter? (read 15 October 2026)
- Citizens Advice: moving home and water bills (read 15 October 2026)
- CCW: water companies and new appointments and variations (NAVs) (read 15 October 2026)
- mygov.scot: how Council Tax works (updated 1 April 2026) (read 15 October 2026)
- NI Water: 2026/27 charges (read 15 October 2026)
What should first-time buyers budget for in a new build?
The bills arrive on different clocks. Plan for the ones that can land late, and all at once.
- Council tax: if banding is delayed, set money aside or pay on account. Peterborough's example is a Band D home in Ailsworth parish, charged £2,321.58 for 2026/27: about £232 a month over the default 10 instalments, or £174 with the 25% single person discount.
- For scale, the average Band D council tax in England for 2026/27 is £2,392, MHCLG says.
- Energy: standing charges are paid every day, even when you use no energy (Ofgem). At Ofgem's average Direct Debit rates for 1 October to 31 December 2026, they are 54.83p a day for electricity and 29.68p a day for gas.
- Check the Energy Performance Certificate: GOV.UK says a new property needs one, and it shows the home's typical energy costs.
- Water: a metered bill rises and falls with what you use, plus a standing charge (CCW).
- Broadband: allow for a connection charge. On OFNL's networks, it says the provider you choose charges one.
- TV Licence: £180, if you watch live TV or use BBC iPlayer (GOV.UK).
- Buying a flat on a heat network? Ofgem says its price cap does not protect you if you get your heat from a heat network.
Sources (8)
- Peterborough City Council (example council): register a new build for council tax (updated 2 April 2026) (read 15 October 2026)
- MHCLG: Council Tax levels set by local authorities in England 2026 to 2027 (read 15 October 2026)
- Ofgem: energy price cap and standing charges explained (read 15 October 2026)
- Ofgem: energy price cap unit rates and standing charges (read 15 October 2026)
- GOV.UK: Energy Performance Certificates (read 15 October 2026)
- CCW: how is my water bill calculated? (read 15 October 2026)
- OFNL: resident FAQs (read 15 October 2026)
- GOV.UK: TV Licence (read 15 October 2026)
In what order should I set up a new build's bills?
Seven steps to prepare before handover and check your first bills.
- 1
Get the supply details before handover
Ask the developer for your MPAN, MPRN, residential meter registration status and the broadband network serving the estate.
- 2
Choose your energy arrangement
Compare available deals and request a start date on or after you become responsible. If you prefer to stay, contact the existing supplier to open an account.
- 3
Record opening readings
Take gas, electricity and water readings when you become responsible. For smart energy meters, confirm the supplier can obtain readings; dated photos are useful backup.
- 4
Register for council tax
Tell the council the completion and move-in dates. If the home has no band yet, set money aside for the bill while the council arranges assessment.
- 5
Tell the water company
In England and Wales, give the water company or site’s NAV your responsibility date and water meter reading. Check the separate arrangements for Scotland or Northern Ireland.
- 6
Order broadband on the estate network
Check which providers serve the address and book an available activation or installation date before you need the connection.
- 7
Check the first bills
Check start dates, tariffs and opening readings. If your chosen energy deal started after you became responsible, check the existing supplier’s bill for the intervening period too.
Sources (5)
- E.ON Next: moving home and switching energy (read 15 October 2026)
- Citizens Advice: moving home, dealing with your energy supply (read 15 October 2026)
- GOV.UK: start paying Council Tax (England and Wales) (read 15 October 2026)
- Citizens Advice: moving home and water bills (read 15 October 2026)
- OFNL: open access full-fibre networks on new developments (read 15 October 2026)
Where does Taupia fit in a new-build move?
- Taupia helps you compare available energy, broadband and mobile deals for the new address. Availability depends on the registered meters and networks serving the development.
- For eligible energy deals you can apply through Taupia and request an available start date. You choose whether to proceed. Your chosen supplier confirms the contract and supply date; broadband and mobile offers may take you to the provider to complete the order.
- You can keep household bills and dates together and, if you share the home, split bills and track who has paid.
- For council tax and water, use the council’s or water company’s registration route. Taupia can help you find setup information, but these bills are not a choice between competing household suppliers.
Questions about bills in a new-build home
Who is my energy supplier in a new-build home?
The developer arranges the initial supply and can give you the supplier name, MPAN and MPRN. Once the residential supply is registered, you can arrange a new deal for an available start date or contact the existing supplier to stay. If no agreed contract is in place when you start using energy, the existing supplier normally supplies you on a deemed contract.
Can I switch energy supplier straight away in a new build?
You can arrange a switch once the residential supply is registered, with a start date on or after you become responsible. Ask the chosen supplier which dates are available. If the address or meter cannot be found, ask the developer to confirm the MPAN, MPRN and registration. Take opening readings or confirm the supplier can obtain smart readings, whether you switch or stay.
Why haven't I had a council tax bill for my new build?
Often because the Valuation Office has not banded the home yet, or because the council does not know you have moved in. Once there is a band, the bill is backdated to your move-in date or the date on a completion notice. Peterborough City Council warned in March 2026 of banding delays of over a year in some cases, so set money aside.
Do new builds have to have full fibre broadband?
New homes in England and Wales must be built gigabit-ready and get a gigabit-capable connection if one costs no more than £2,000 per home, or otherwise the next fastest connection within that cap. Scotland requires gigabit-ready infrastructure, with a connection where reasonably practicable. In England and Wales, sites whose plans went in before the rules started can be exempt.
Why can I only get one broadband provider on my estate?
Because the developer chose which network to install, and only providers that sell over that network can serve you. Some estate networks are open to many providers: OFNL lists 18 residential providers on its network. Use the network's own postcode checker to see who can serve your address.
Do new-build homes have water meters?
In England and Wales, yes. CCW says all new houses have had to have a water meter since 1990. You pay for the water you use plus a standing charge, and you cannot switch to an unmetered bill. Take a meter reading on the day you move in.
Can I challenge the council tax band on my new build?
Yes. In England and Wales you have a legal right to challenge within 6 months of becoming the council tax payer, and you keep paying while the Valuation Office reviews it, which can take up to 4 months. In Scotland, challenges go to your local assessor instead.
Set up each bill at your new home
The setup guide for every bill on the checklist.
Start here
Your First Home scheme: costs beyond the mortgage
RecommendedThe monthly bills GOV.UK's example leaves out, the loan's interest and stamp duty.
- Who is my energy supplier?Find your gas and electricity supplier, your MPAN and MPRN, and the network operator for your area.
- Set up broadband in a new homeCheck what the address can get, then order or move your service in time.
- Register for council tax when you moveHow to register, the discounts to claim and how bands work.
- Set up gas and electricity in a new homeMove-in readings, the deemed tariff and when you can switch.
- Set up your water billFind your water company, register and read the meter.
- Move-in bills checklistEvery bill to set up when you move, and when to act on each.
- Buying a house: which bills to set upEvery bill dated from completion day, with the seller's readings and solar panel payments.
- Moving into a flat with communal heatingWhat a heat network means for your bills, and what the price cap does not cover.
Moving into a new build?
Compare available deals for your new address, keep track of setup dates and organise shared bills with Taupia. Check the developer’s meter and network details first so you can choose services that are available at your home.
Cite this page
Taupia. "How do I set up the bills in a new-build home?". Last updated 20 October 2026. https://taupia.com/move-home/new-build-bills-setup